Search Building Permits
7,596 permits matching "hvac"
(eplan) Supplemental to 24016-10000-38956 for new Equipment Platform on Level 1 to be used exclusively to provide access to the mechanical systems above.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Replacement of complete existing central heat and air system with or without duct work
Addition and new bathroom. Cosmetic updates to the existing structure new attached carport and addition of extra driveway space. ***Install new plumbing in the hallway bathroom and kitchen and install...
RENOVATION OF EXISTING CELLAR WITH PLUMBING WORK AS PER PLAN: REPLACE WASHER, DRYER AND BATHROOM; NEW (4)COMBI. BOILERS AND (1)HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER...
Adding roughly 1100 square feet of livable space to existing single-family home. Addition includes 3 new bedrooms 2 new bathrooms and remodeling existing front door and entry way.
Interior alteration of existing common restrooms.
Replacement of complete existing central heat and air system with or without duct work
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Replacement of complete existing central heat and air system with or without duct work
Install new commercial kitchen ventilation at cellar to roof. New commercial HVAC system for new/existing eating or drinking est. at all floors. Filed in conjunction w/ M00981006, M00976389, M00975890...
Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy
Replace existing boiler & hot water tank and install two new cobi boiler with related plumbing work in existing two-family doweling units to comply ecb#39115501l. no change use egress and occupancy.
Construct tenant improvement throughout a commercial office building per plans mechanical included
Adding hood vent to location there is already a current MP with another contractor on file. (2024-084067 MP) We are only doing the hood vent. secondary contractor
New 1-story 1 bedroom 1 bathroom dwelling unit with covered porch.
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
Partial demo of the structure exterior wall to install new windows and interior remodel throughout the interior structure. Interior walls removed per structural drawings. Slight relocation of electric...
New addition on the rear of the home with 2 new bedrooms and a new flex space added on the inside of the house.
Proposed filing for Boiler Replacement.