Search Building Permits
8,917 permits · Electrical
Remodel of existing LA Fitness Club Studio. Scope includes substantial interior remodel. No changes to the pool. Exterior work limited to painting adjustments to existing glazing and cornice modificat...
Install Level 2 EV Charger
We are replacing wire that was stolen between the transformer and main switchgear. No upgrade.
New SFR 2- Story 2 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio PUD
Finish out for admin office
New condo regime - bldg #2 duplex unit #2a type 3 (b0) 2 bed 2 bath unit #2b type 3 (b0.1) 2 bed 2 bath
Line voltage electrical work. new permanent 100 amp service disconnecting means with 1 circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: meter, service conductor, main panel, e...
Line voltage electrical work. new permanent 100 amp service disconnecting means with 1 circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: exterior.
Building 542: Construction of elevated platform for exterior electrical load center and transformer.
Remodel Office to Extend Corridor - Floor 10
ePlan: Residential Expedited Review - New THREE UNIT RES. New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. 3213 WALNUT AVE Unit A New construction of a 2-Story Duplex [5bed 5bat...
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 2.5bath] with Habitable Attic and Attached Carport.
Relocation of existing electrical service AE remove electrical meter due new location required
Interior remodel to existing office space. Minor MEP Scope. No Access Control.
Tesla Wall Connector EV Charger Installation Eaton CH 60Amp 2-pole breaker in main panel using 3C #6AWG THHN .
200 AMP Panel Replacement Installing Circuit 1-30-26 JM - Main panel was not replaced EC replaced sub-panel. COA does inspect past main in the ETJ. Permit was not required.
Upgrade the electrical service Demo existing electrical meter and main panel and install new 200-amp electrical meter and panel
tpole ref 2025-161700 BP
Valero Gas Price Sign @ 20 OAH
Electrical Vehicle Charger installation