Search Building Permits
15,450 permits · Roofing
installation of solar panels, rooftop, railed, grid-tied, 16 modules, 6.56 KW
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
Filing for work at exp.1, erected porch & front steps of masonry stone & cement with metal railing, also erected brick facade at exp.1 & exp 2 from ground level to roof line. to resolve hrp# 4a08981....
solar panels on roof install
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Installation of 105.185 kw solar energy system on roof. No change of occupancy, use or egress.
Construct enlarged elevator bulkhead on the roof to accomidate upgraded freight elevator. no change to occupancy use or egress under this application.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Structural Framing for 1st, 2nd, 3rd, 4th Floor and Roof for the new building.
Outriggers system installation for roof and facade repairs, no change in use, egress, or occupancy.
Roof evaluation, structural repairs, and maintenance. Remove and replace roof structure at base of upper dome. No change in use, egress, or occupancy as a result of this application.
Decommission of existing tmo site. remove equipment platform and dunnage, 9 antennas, 6 rrh and 1 gps from roof. remove cables from basement facade and roof. no change in use, egress or occupancy. ori...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Installation of proposed temporary shoring for east facade repairs from cellar to roof. no change in use, egress or occupancy.
Filing herewith landscape scope for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No change in use, occupancy...
Installation of 52.8 kw solar energy system on roof. No change of occupancy, use or egress.
Existing heating piping removal, new heat pump vrf system, associated ductwork. new toilet exhaust fans on roof, and associated ductwork modifications as per plans filed herewith. no change to use, eg...
Modification of Roof per plans filed herewith
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.2 KW