Search Building Permits
15,450 permits · Roofing
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Supplemental permit to 23010-20000-02416 to revise the adu's required solar panels location to be installed over single family dwelling roof. < sfd address is 15257 w tuba st> no change in height
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing for work at exp.1, erected porch & front steps of masonry stone & cement with metal railing, also erected brick facade at exp.1 & exp 2 from ground level to roof line. to resolve hrp# 4a08981....
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_16_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ...
Direct replacement of an hvac condenser on the roof on the existing steel dunnage beams. no change in use, egress and occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
2026/03/17 | Storytelling Event featuring global stories on Womens Health -Hosted by Gates Foundation and The Moth The event will be on March 17 2026 at The Contemporary Austin Jones Center Moody Roof...
Herewith filing roofing replacement limited facade work at bulkheads as per plans. no change in use, egress or occupancy.
Herewith filing roofing replacement limited facade work at bulkheads as per plans. no change in use, egress or occupancy.
Herewith filing roofing replacement limited facade work at bulkheads as per plans. no change in use, egress or occupancy.
Herewith filing roofing replacement limited facade work at bulkheads as per plans. no change in use, egress or occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
General construction consisting of roof and window replacement, EIFS over cladding insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
Sotomayor Bldg 07, Interior, Exterior Roof & Facade repairs: Removal/replacement/repairs of existing roof membrane, flashing, window, concrete, parapet, drains, steel stairs, ladder and plaster. Insta...
Construct enlarged elevator bulkhead on the roof to accomidate upgraded freight elevator. no change to occupancy use or egress under this application.