Remove & replace 11 existing roof drains, relocate 2 existing roof drains and remove & replace 17 existing vent stacks, provide extensions to 2 vent stacks As per plans filed herewith.
Decommission of existing tmo site. remove equipment platform and dunnage, 9 antennas, 6 rrh and 1 gps from roof. remove cables from basement facade and roof. no change in use, egress or occupancy. ori...
Relocate existing roof mounted general exhaust fan and modify associated ductwork; replace roof restroom exhaust fan and modify existing exhaust duct system as per plans filed herewith. no changes to...
Temporary roof / overhead protection at adjoining properties during bldg alteration, filed sep. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress...
Remove & replace 11 existing roof drains, relocate 2 existing roof drains and remove & replace 17 existing vent stacks, provide extensions to 2 vent stacks As per plans filed herewith.
EplanSUPPLEMENTAL TO PERMIT #21010-10000-05063 TO REVISED FLOOR PLANS ( LEVEL 1&5), PARKING LAYOUT , ROOF PLAN & ROOF STORAGE . PER CPC-2021-2908-ZC-HD-ZAD-WDI-SPR-1A
New construction, addition, GFA change - For the addition of a roof deck, accessed via an existing roof access structure. Roof deck to include two pergola shade structures. Size and location per plans...
remove chimney above roof line patch roof
remove chimney above roof line patch roof
remove (e) root materirals throughout roof and install new self adhesive modified bitumen throughout roof. no hot tools - no hot works.
rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expan...
re-roofing no hot works. no work to (e) roof structural sheathing.
Temporary roof protection at the adjoining property as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replacement of existing split system HVAC (condensing unit on roof, air handling unit in cellar, lineset). Installation of new split system HVAC on roof and cellar with lineset. All work in compliance...
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Waterproofing at interior side of cellar foundation walls, patch/repair of failing/cracking concrete slabs, beam encasements, column encasements and walls, replacement of roof system with new roofing.
Replacement of existing roofing plys. existing roof decking and structure to remain. no change in use, egress or occupancy.
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Self cert 2019 chicago construction codes-construct a new three story plus basement three unit multi-family building with a roof deck. construct a four car detached garage with a roof deck. constructi...