Search Building Permits
8,917 permits · Electrical
Addition/Interior Remodel - Primary bathroom remodel primary closet addition to existing house. New accessory building with exercise room guest room and bathroom.
New Construction in the ETJ Lift Station
BUILDING 2 UNIT 2B: New 3-story residence (duplex residence) with entryway going up to second floor 2nd floor kitchen & living area 2 bedroom 2.5 bath.
Garner S401 C Right New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
100A temp power
BUILDING 2 (2a): New studio apartment (duplex residence) w/ 1 bathroom & includes the carport & porch for building 2.
#1 Spark ID
ETJ new service for SFR
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase1-A.
Interior renovation tenant finish out - 3k sf of space that is currently a dentist office
Temp power for remodel of house Ref: 2026-000323-BP
Sign #3 Pick Up (illuminated)
Interior remodel including full kitchen ELECTRICAL: Replace exterior and interior service panels. Replace switches outlets and add LED puck lighting in kitchen den and dining area. No structural frami...
new constructions - construction of 2 story accessory dwelling unit rear of main house 2/2
Sign #2 Spark ID (Rear Bldg Elevation)
Sign #2 Walmart Letters (Rear Bldg Elevation)
Sign #1 Letters ID (front bldg elevation)
Alterations/modifications to existing 1st and 2nd floor to support electrical update to hospital as per plans. No change in use, egress, or occupancy.
need meter removed to safely replace old electrical panel
Low voltage/communication electrical work. install data/video. specific location: 27th & 28th floor.