Search Building Permits
16,428 permits matching "roofing"
Temporary roof protection at the adjoining property as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Self cert 2019 chicago construction codes-construct a new three story plus basement three unit multi-family building with a roof deck. construct a four car detached garage with a roof deck. constructi...
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Replacement of existing roofing plys. existing roof decking and structure to remain. no change in use, egress or occupancy.
PHOTOVOLTAIC ROOF MOUNT SYSTEM 20 MODULES-ROOF MOUNTED - 8.2 kWDC, 7.68 kWAC
INSTALL 9.68 kW (DC) FLUSH SOLAR PV SYSTEM - 1 ARRAY/11 MODULES AT SOUTH SIDE SLOPE OF SFD ROOF AND 1 ARRAY/11 MODULES AT SOUTH SIDE SLOPE OF DETACHED GARAGE ROOF. Does the system include battery back...
Installation of new VERIZON site of the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRH units, 3 GPS antennas and 1 Platform (3 cabinets) with similar related dunnage. Relat...
Temporarily remove and reinstall roof mounted solar panels to enable roof repair to be performed by others
General construction work to horizontally and vertically enlarge existing building on the cellar, basement, 1st thru 3r floors and add 4th floor, 5th floor, roof and roof bulkhead as indicated on draw...
Installation of temporary roof protection as per plans during general construction work. no change in use, egress or occupancy. roof protection to comply with chapter 33 of nyc building code of 2022.
Replacement of roof drains and drain piping in conjunction with roof and exterior repairs. no change to use, egress, or occupancy.
ePlanSUPPLEMENTAL TO: 22010-10000-05318 to revise (E) sfd to remove sprinklers. Only adu will be sprinklered, provide 2-hr wall between sfd and ADU, add skkylight to bedroom (where indicated, reduce r...
Installation of new VERIZON site of the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRH units, 3 GPS antennas and 1 Platform (3 cabinets) with similar related dunnage. Relat...
General construction work to horizontally and vertically enlarge existing building on the cellar, basement, 1st thru 3r floors and add 4th floor, 5th floor, roof and roof bulkhead as indicated on draw...
Erie to remove existing roofing and properly dispose. Erie to furnish and installice and water shield where applicable.Erie to furnish and install fiberglass dimensional shingle.Erie to furnish and in...
Replacement of roof drains and drain piping in conjunction with roof and exterior repairs. no change to use, egress, or occupancy.
Installation of temporary roof protection as per plans during general construction work. no change in use, egress or occupancy. roof protection to comply with chapter 33 of nyc building code of 2022.
solar permit: installing 20 solar pv modules, 405 watts per module, total no. of rating 8.1 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units...
AT&T - Installation of new steel platform with related cabinets on roof. Installation of related antenna sectors with RRH units and GPS on roof. Related service connection. All work in compliance with...