Search Building Permits
16,469 permits matching "roofing"
repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof.
re-roof: tear-off existing roof. install new comp singles. (no hot works) approx. 12 sq ft.
Modification to existing Verizon site. Replace 1 equipment cabinet, 4 antennas, and 2 RRH units on roof. Install 2 new antennas (1 per sector) on roof. All in conformance with TPPN 5/98.
Mechanical work on the cellar, basement 1st thru 5th floor, roof and roof bulkhead as indicated on drawings
M276 - Replace roof drains and roof trench drains
M276 - Replace roof drains and roof trench drains
Mechanical work on the cellar, basement 1st thru 5th floor, roof and roof bulkhead as indicated on drawings
Modification to existing Verizon site. Replace 1 equipment cabinet, 4 antennas, and 2 RRH units on roof. Install 2 new antennas (1 per sector) on roof. All in conformance with TPPN 5/98.
solar permit: installing 15 solar pv modules, 405 watts per module, total no. of rating 6.075 kw. mounted: roof, ballasted: n | revision to : s20251030278 residential roof mount pv system. system size...
Re-roof flat roof 2020 msbc
revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31...
Remove existing roof drains and provide new roof drains.
dunnage modifications at roof, ramps for accessible terrace roofs
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & sto...
ePlan: Enclose existing covered balcony and replace clay tile roof with metal roof
ShopRite:Proposed interior alterations,as shown on plans.The work includes the removal of existing shelving&refrigerated cases,and the installation of new shelving and cases.New roof top refrigeration...
Installation of (3) air cooled split systems & (2) air cooled roof top units located on the 14th floor roof.
Installation of (3) air cooled split systems & (2) air cooled roof top units located on the 14th floor roof.
dunnage modifications at roof, ramps for accessible terrace roofs
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & sto...