Search Building Permits
8,917 permits · Electrical
Line voltage electrical work. new permanent 200 amp service disconnecting means with 28 circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: electrical.
TEMPORARY BUILDING PERMIT scope of work is limited to foundation and utilities for building and electrical for ATR-21. TBP for plumbing added: scope of work is limited to installing underground plumbi...
Install EV charger
Interior alteration including reconfiguration of existing check out area.
ePlan: Tenant Finish Out for Equipment Installation for OTA & WSCE Chamber Rooms - Phase 5 - Lobby Level App #9
Unit 12 - New two-story detached single family residence. (2) bedroom (2.5) bathrooms attached 1 car garage. Floor plan type: The Roosevelt B-L-Elevation Option 1. Building Height 26ft-7 1/2in. Maximu...
(Nguyen Eric) Request to Disconnect (CDP) Upgrade to 200amp service.
Interior renovations for small outdoor bar. Site exemption change of use approved included in submittal
ePlan: Commercial Expedited Review - New Gen Set and Catwalk. (400 SF)
Interior Remodel: Full home remodel master bathroom remodel guest bathroom remodel - see application for full scope of work
IR and Garage conversion - complete interor renovation with removal and relocation of interior walls. Exterior alterations to allow for the addition of new windows on the west (side) and south (rear)...
Express: Nonstructural Demo and Exploration kitchen remodel remodel of 3 bathrooms new flooring exterior doors size-for-size replacement. Windows size for size replacement. Interior painting and drywa...
22kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Marcus Lines)
Two New ground of construction of one story tilt wall warehouse with small office S-1 and B Occupancy - Building 1 & 2 (2) Applications
ePlan: Commercial Expedited Review - *SMART HOUSING* New Shell of Multi Family Building Apartments Fire Area 1 (1104 SF).
Disconnect/reconnect of services to perform the Installation of a GENRAC 26 KW NATURAL GAS GENERATOR
Interior Remodel
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
repalacing phase A coming from the utility pole needs to be repaired per Austin Energy ae shut off service no meter work repair made on panel same size
Express: Interior non structural remodel of existing kitchen and bathroom. Kitchen: Remove and replace fixtures appliances tile countertops lighting. Minor plumbing and electrical work for cosmetic up...