Search Building Permits
15,791 permits matching "roofing"
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Decommission of existing T-MOBILE site on the roof. Initial application filed under Job No. B00081867. No change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Interior & exterior alterations throughout on all levels. work includes gut demolition, structural work, new walls, ceilings, roofing, windows, doors & siding
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
Installing 4 new roof drains and re-flashing of existing vent stack extensions.
Structural work for new steel dunnage installation atop existing roof for new mechanical equipment as per plans filed herewith. no change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Replacement of roof drains and associated piping.
Remove and Re-install existing roof mechanical equipment
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Replace existing roof drains
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Filing for a temporary mock up at the roof. No change to use, egress. or occupancy.