Search Building Permits
15,884 permits matching "roofing"
Spr 2019 cbrc - renovation to existing 2-unit, two-story, residential coach house. project calls for new layouts for both units, masonry repairs to existing brick walls, construction of a new roof, an...
Decommission of existing T-MOBILE site on the roof. Initial application filed under Job No. B00081867. No change in use, egress or occupancy.
Installing 4 new roof drains and re-flashing of existing vent stack extensions.
Proposed int/ext remodel to ex 1-story single family dwelling - enclose under ex front porch roof for new entry/foyer addition. remodel ex two bathrms, bedroom & kitchen per plan.
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x18'-0' '. hip roof height to peak: 12'-0' '.
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 24'-0' ' x20'-0' '. hip roof height to peak: 12'-0' '.
Remove and Re-install existing roof mechanical equipment
ePlan. Demolition of the existing patio roof
Replace existing roof drains
Structural work for new steel dunnage installation atop existing roof for new mechanical equipment as per plans filed herewith. no change in use, egress or occupancy.
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Cps school, no change in use. monarcas elementary. the work consists of: roof replacement, masonry repairs, interior repairs, mechanical equipment replacement, exterior lighting, limited landscaping.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.