Search Building Permits
9,404 permits matching "hvac"
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Installation of (6) new gas fired boilers.
Install 1 zone mini split
Restore gas service, repair riser, register furnace.
Replace two standard efficiency hot water boilers in the same residence. Standalone Permit.
Replace gas burner on existing boiler.
Boiler filing design includes the removal of (1) existing boiler and the installation of 1 new high efficiency boiler with exhaust and combustion ventilation air piping. no change in use, egress, or o...
Herewith filing general construction modifications for Boiler Replacement project. No change in use, egress, or occupancy.
Replacement of 5 hvac units on floor 001 and the roof with a total capacity of 29 tons. no change to egress, use, or occupancy.
Job file for replacement of the existing combine boilers. also to withdraw the laa#400011964, no change in use, egress, or occupancy.
Provide split system air conditioning unit.
Replacing existing gas fired boiler in the cellar with new as per plans filed herewith. NOTE: This filing supersedes filing B00822455-I1.
Application is being filed for basement floor interior renovation, install boiler, h.w.t, laundry and convert two to three fixture bathroom in basement for accessory use. no change use, egress, occupa...
Direct replacement of all plumbing fixtures and 3 boilers. no change in use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Abandon existing buried 8,000-gallon fuel oil storage tank as per plans. no change in use, egress or occupancy.
Install new gas boiler
Install a new HVAC system on the 1st floor and the 2nd floor setback roof for the existing eating and drinking establishment. No change in use, occupancy, or egress.