Search Building Permits
9,404 permits matching "hvac"
Replacement of existing hvac roof top units.kitchen exhaust ventilation system ( hood, duct & fan.) for 5 guys burgers and fries restaurant tenant space.
Direct replacement of 3 gas boilers filing no change under use, egress or occupancy.
Associated mechanical work for replacement of three (3) boilers and three (3) gas/oil burners as per plans. no change in use, egress or occupancy.
Replace existing three domestic hot water boilers and storage tanks with three domestic hot water heaters and five domestic hot water storage tanks. connect to existing gas piping. no change in use, e...
Existing fire damaged apartment unit (10276) in apartment complex. Building footprint to remain the same (No additional square footage).
Addition/remodel. Addition of an expanded covered porch to rear of existing 2-story single family residence. Comprehensive interior remodel. Reconfigure interior layout including adding shower to exis...
Job file for replacement of the existing combine boilers. also to withdraw the laa#400011964, no change in use, egress, or occupancy.
Herewith filing general construction modifications for Boiler Replacement project. No change in use, egress, or occupancy.
ePlan-Expedited Review: New Construction of Multi-Family Building. Phase 2 contains leasing Concierge Wellness Amenity and Mail. (61035 SF)
ePlan-Expedited Review: New Construction of Retail Shell Space for Unit A. (4820 SF)
Restore gas service, repair riser, register furnace.
Replacement of complete existing central heat and air system with or without duct work Located in Hallway closet.
Associated mechanical work for replacement of three (3) boilers and three (3) gas/oil burners as per plans. no change in use, egress or occupancy.
Application is being filed for basement floor interior renovation, install boiler, h.w.t, laundry and convert two to three fixture bathroom in basement for accessory use. no change use, egress, occupa...
ePlan-Expedited Review:New Construction of Multi-Family Building. (149070 SF)
*Green Building* New 2-story 5 bedroom 4 bathroom single family residence with covered front porch and rear covered patio.
Replacement of complete existing central heat and air system with or without duct work Pam Bossert - Replacing like for like 3.5t vert Heat pump
Convert a portion of existing attached garage into expanded laundry room. Comprehensive interior remodel reconfigure interior layout. Install new windows. Demolish unpermitted covered front porch addi...
Replacement of 5 hvac units on floor 001 and the roof with a total capacity of 29 tons. no change to egress, use, or occupancy.
Replace gas burner on existing boiler.