Search Building Permits
9,343 permits matching "hvac"
Replace LP gas fired HW boiler
Plumbing work on cellar of existing mixed use building with cap/remove hot water boiler and install hot water heater. no change in use, egress or occupancy.
Filing to replace in kind of packaged rooftop HVAC unit on existing steel dunnage and respond ECB violations.
Boiler replace
Mechanical work filed in conjunction with renovation to ex. apt# phe. install split hvac system. install kitchen and toilet exhaust fans. remove 1 existing rooftop mechanical unit, install 2 rooftop c...
Filing to change from oil to gas and install replace boilers and water heaters
Replace left hand boiler and gas burner (boiler no. 1)
Replacement of existing wall a/c units with new ductless air conditioning systems. no change in use, occupancy, or egress.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
Interior alteration including reconfiguration of existing check out area.
ePlan: Residential Expedited Review -New construction of a 2-Story Single Family Res. [4bed 3bath]. Bldg 2
Plumbing work on cellar of existing mixed use building with cap/remove hot water boiler and install hot water heater. no change in use, egress or occupancy.
1. repair boiler room floor and provide new finish flooring. repoint interior masonry wall. patch plaster at ceiling. 2.patch and repair exist. plaster ceiling on first floor. 3. remove window pane at...
ePlan: Residential Expedited Review - New construction of a THREE-UNIT RES. UNIT 2 2-Story [4bed 4bath] with attached Carport
Replacement of complete existing central heat and air system with or without duct work
Replace LP gas fired HW boiler
Replace left hand boiler and gas burner (boiler no. 1)
New SFR 4 bedrooms 3 bathrooms attached 3 car garage covered entry porch and patio
NYCHA Sumner BOILER-BLDG #13- Structural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project.
INSTALL REPLACEMENT 2,500-GALLON FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. REMOVE EXISTING 4,000-GALLON FUEL OIL STORAGE TANK. FILED IN CONJUNCTION WITH LAA APPLICATION No. M01312797-I1-LA.NO CHAN...