Search Building Permits
26,853 permits · Renovation
General construction plans filed herewith to show interior alteration for store. . no change in use, egress and occupancy
Supplemental permit to 25010-30000-00529 to update the address per boe . **no-fee department error**
Suppl. permit to 25016-20000-34491 to revise the framing plans.
Spr 2019 cbrc. revision to permit 101064511 includes: stationhouse structural steel repairs and associated masonry revisions, revision to create entrance at current station house east exit, and additi...
Self-cert 2019 cbrc: alteration to the first floor of a 4-story condominium building to create a door opening between two consolidated dwelling units. (occupancy group r-5, type iiia construction)
Repair (26% to 50%) for wood porch (open) (quantity: 1, location: rear of building).
Facade repairs. no change in use, egress or occupancy.
Supplemental permit to 25016-20000-09411 to revise framing and shear wall.
interior renovation of the WALK-UP APARTMENT building as shown on plans filed herewith. No change to use, egress or occupancy.
Installation of a new 8' plywood temporary construction fence located within the property lines to adequately enclose the area of work for residential alteration.
Alteration for enlargement to existing 2 story + bas, proposed 6 story + cellar residential use building.
Renovation of existing apartment #11DS as per plans. Remove & install non-bearing interior partitions, remove existing soffit, ceilings, patch existing beams. No change in use, egress or occupancy is...
interior and exterior renovations - new addition-new c of o -conversion from 4 to 2 family-all finishes as shown on plans.
Ground floor garage repairs
Filing herewith mechanical work in conjunction with renovation of exisitng office as per plans. no change in use, egress or occupancy.
Herewith filing for 2nd flr interior renovations per plans. no change in use, occupancy or egress under this application.
EplanSupplemental permit to 24020-10000-02365 to add remodel (E) ramp to be disable access ramp and revise architectural and structural plans.1 of 2
5 door(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and window...
EPLAN- DEMO THE TWO (E) PATIO COVERS, ADD NEW ATTACHED PATIO COVER PER LA CITY IBsee comment
Convert (11) REC ROOM ROOMS TO ADU'S PER Gov. Code 65852.2(e)(1)(C)