Search Building Permits
26,853 permits · Renovation
4th Level Cath Lab Remodel. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: pope architects
revision 202512051150- interior stairs replacement from 1st to 2nd floor
recommmencement and completion of work approved under pa# 202205244906 & 202404301038.
comply with nov #201901041. 2nd fl: enclose the front entry way, new entry door and 2 windows. change front bedroom to dining room.
revision to bpa 202202238554: remove bathroom skylight from scope of work.
ANTENNAS ON BUILDING Rated Exit Stair Enclosures are not allowed as a raceway for any of the installation 2020 Minnesota State Building Code
unit #3, #34 and #55: providing openings and carpentry repair for the installations of two gas lines done by others, restoration after install of gas lines, perform ext concrete patch repairs where cr...
unit 404: master bath remodel, converting tub to walk-in shower. bath remodel. subpanel location change. remodel (e) kitchen. add laundry facilities and add 25 recessed lights.
-2851 24th st: seal glaze over existing concrete. -2857 24th st: tile or lvp over plywood floor.
bldg 2: tear off to shething. replace with tpo 60 mil with vapor barrier. no hot works
comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed...
to abate nov 202651567 remove (e) masonary fire place and relocate (e) non bearing wall.
remodel (e) kitchen, bathroom. add 1 new full bath. repair (e) interior stair & replace (e) sheetrock w/ new at 2/f. remodel (e) bedroom, bathroom. add 1 new bathroom, 1 bedroom, & install wetbar at g...
replace existing shingles only, no hot works. class b min.
to obtain final inspection for work approved under pa# 202308285444. all work is complete.
reommencement and completion of work approved under pa 202208241186.
the fabrication and installation of 8 acrylic evacuation maps for 13th and 14th floors.
remove and replace 16 accessible showers in each unit in north easternmost stack of building floors 2 through 10 and 12 through 18.
remodel bathroom on ground floor in kind convert bathtub into shower. infill 2 windows at rear of building and remove and replace sliding door at rear. no work is vivisble from street.
legalize ground flr bar to 2 burners. 2/f: demo existing kitchen and convert to 3rd bedroom. remodel bathroom and new kitchen at existing dinning room.