Search Building Permits
26,853 permits · Renovation
kitchen & bathroom remodel on 1/f.
install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank.
add kitchenette w/ sink & 2 burner cooktop on 1/f. response to complaint # 202650526 to remove the cover for the front entry stairs, including the framing and corrugated panels.
Basement egress window this permit does not approve a basement bedroom, existing finishes built without a permit, additional dwelling unit or work other than described. plan submittal is required with...
Removing tub, tile, vanity and fixtures from 2nd floor bathroom . Replacing tub with a walk in shower. New tile, fixtures, and paint. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CH...
remodel bathroom in kind, hallway bathroom change tiles, sink, toilets
add two 2nd floor bedrooms and bathroom at rear of the house.
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).
to obtin final inspection for work approved under pa #202502059725. all work is complete.
1str fl : convert e family room to new bedroom. new media room. expansion of e bathroom. new wet bar.
revision to pa # 2025-0821-3599: install (1) omnion outdoor plants, remove (8) 170 ah batteries and relocate (12) 170 ah batteries.
to obtain final inspection for work approved under pa # 202208049962 & 202406043709. all work is complete.
unit #2820: remodel kitchen and bathroom (studio). new cabinets, like for like. no walls or doors alterations, (e) layout to remain unchanged, no change to occupancy, egress, or modification to common...
to obtain final inspection for work approved under pa# 2013-1107-1401, pa# 2013-1226-5030 and pa# 2014-0110-5977
r/r old & dryrot shears. replace old shearwalls & restucco. all work on side profile. in-kind. not street visible.
sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new ent...
g/f: e) master bedroom to be converted into e) sitting room, e) kitchen to be converted into bedroom, remodel e) bathroom. 2nd/f: remodel e) bedroom, remodel e) kitchen & e) bathroom
repair back deck, replace crack stringers and add middles stringer reinforce as needed, replace redwood deck for trex work not visible from street, less than 50% repairs.
common area: repair and replace in kind deck, railing, and posts dor dryrot. rear ceck and stairway, no changes to configuration. less than 50 % repairs, non street facing.
repair stringer for the stair just 8 ft and 4 x 4 post pt exterior, side of the house, not facing the street, in kind, not extend over the right of way, less than 50%