Search Building Permits
15,450 permits · Roofing
Replacement of four rooftop units on the lower roof and upper roof with a total of 30 tons. no change to egress, use, or occupancy.
Filing for replacement of main and bulkhead roofs, replacement of roof and balcony railings,facade repairs, balcony and walkway repairs and coatings, interior partition construction as per plans. no c...
Addition - MODIFY AN UNCOVERED 10X10 CONCRETE PATIO TO A 12X20 COVERED PATIO WITH CEILING FANS. TIE ROOF INTO EXISTING
Remedial waterproofing and sub drain along foundation at +/- 3' depth on sfd.
Replacement of main and bulkhead roofs, balcony repairs, parapet replacment, brick replacement, pointing, sill replacement, shelf angle replacement, interior repairs/upgrade as per plans. no change in...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___25__Squares. Class A roof covering is required within Very High Fire Hazard Se...
Installation of solar panels on roof. no change in use, egress, or occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over EXISTING solid sheathing __5____Squares. Class A roof covering is required within VeryHigh Fire Hazard Seve...
Preparation Work for Full Demolition - Removal of Rooftop Equipment
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing: tear-off and apply 3-ply modified bitumen one ply torch down roof system; flat roof, hot works.
Reroof -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC
new roof deck, stair, and retractable skylight.
single family residence remodel + addition of adu unit at ground level. vertical addition to add 3rd level. (n) roof, improvements: floor reconfiguration, (n) windows, (n) facade, (n) rear decks
re-roofing: remove about 20 sq of flat roof, replace all roof flashings with new ones, install 1/2" iso boards & 60 mil tpo roof, no hot works, applied with welding gun.
sheathing replacement dry rot exist, peel and stick roll roofing, replace in kind.
re-roofing no torch down.
reroofing: remove & dispose of old roof materials. wood rot inspection. layer & torch down.
re-roofing: tear off old roof surface, apply 1 layer 28lb base felt down, apply 1 layer of sta torch down, apply 1 layer of gta torch down
remove existing asphalt shingle. install 30lb felt, tl residential asphalt composite shingle roofing. no torch down.