Search Building Permits
15,450 permits · Roofing
roof repair (due to leak). interior bathroom restoration - ceiling repair, wall repair, finishing sink in bathroom will be disconnected to access wall substrate.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Small roofing repair
solar permit: installing 15 solar pv modules, 405 watts per module, total no. of rating 6.075 kw. mounted: roof, ballasted: n | revision to s20260115434. residential roof mount pv system. system size:...
solar permit: installing 12 solar pv modules, 440 watts per module, total no. of rating 5.28 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 5 kwh each in capacity, ess units wi...
reroofing with modified bitumen built up roof system. torch down.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
1/f: attached adu include remodel and ext of (e) structure.convert (e) area adj and to rear of garage & excavation. 2/f:remove porch area to match neighborhood vernacular of porch entry.mirror plan on...
solar permit: installing 13 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla powerwall 3 [1707000-xx-y]...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Filing herewith application for installation of roof mounted solar panels. no change in use, egress or occupancy.
'ps-des park drive east pump station upgrades includes the phased construction of a new pump station structure including concrete work below grade, cmu block above grade, and roofing.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Sprinkler modifications taking place on the 8th floor, and roof as per drawings filed herewith. no change in use, egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Facade restoration and roof replacement including, window lintels, window sill, brick replacement, breick repointing and painting of fire escapes as per plans submitted herewith. no change in use, occ...