Search Building Permits
45,876 permits · Other
Ventilation work, duct distribution as per plans filed herewith. No change to use, egress or occupancy.
Installation of temporary construction shoring for excavation for ps 75x at 984 faile street, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this applicati...
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Installation of new sidewalk shed for ps 75x at 984 faile street, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Removal of existing windows & exterior guards, providenew louvers & exterior guards.prime & paint doors.remove & replace with new concrete pads. new gas meter enclosure . pavement replacement.new meta...
Installation of temporary construction shoring for excavation for ps 4r at 200 nedra lane, staten island as indicated on plans.there will be no change in the use, egress, or occupancy under this appli...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modifications of existing building ventilation system to provide ventilation for all classrooms and offices.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Ps-004r, installation of +/- 257 linear feet chain link fence submitting on behalf of contractor in conjunction with dob # 500876536. no change in use, egress or occupancy.
door and partition general construction work
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.