Search Building Permits
15,399 permits · Roofing
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of photovoltaic solar array on existing roof system as per plans
Sprinkler modifications taking place on the 8th floor, and roof as per drawings filed herewith. no change in use, egress or occupancy.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of new split hvac ductless cassette systems on the 1st floor & condensers at the 2nd floor roof terrace with assoicated piping as per the drawings filed herein.
Installation of 8.8 kw solar energy system on roof. No change of occupancy, use or egress.
EPLAN TENANT IMPROVEMENT AND ADDITION TO EXISTING OFFICE BUILDING. WORK INCLUDES ADDITION OF SECOND STORY, WITH NEW ADA BATHROOMS, OPEN OFFICE AND ACCESSIBLE ROOF AREA. NO CHANGE OF USE. NO SITE WORK....
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 3 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Sprinkler modifications taking place on the 8th floor, and roof as per drawings filed herewith. no change in use, egress or occupancy.
Install new 3.8kW rooftop solar system to existing residential only using backfed breaker only.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.