Search Building Permits
45,636 permits · Other
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Easy Scale Scaffold installation as per plans filed herewith.
Installation and use of temporary overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Here to file construction work of proposed eating and drinking establishment at cellar to install new partition and door as per plan. file to address ecb 39136068m, 39136069y. no change to use, egress...
Installaion of stucco to front facade
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for the installation of: one 1.75 ton heat pump unit, one (1 ) ton air handler unit, one 0.75 ton air handler unit. no change in use, egress, or occupancy.
Mechanical work in conjunction to GC JOB#B01193867-l1. No change in use, egress, or occupancy.
NEW ONE STORY ACCESSORY DWELLING UNIT PER GCS 66323(a)(2). ALL WORK PER WFPP
**2025 wildfire ** site prep - removal and recompaction for proposed building under 25010-10000-05576
Filing structural application subsequent to primary job number X01265999-I1.
Exterior restoration as per plans filed herewith, No change to use, egress or occupany
PAA requested because the SOE drawings have been updated.
A.remove partition walls.b.remove shower & bathtub from basement bathrooms.c.remove gas & electric stoves from basement.d.resolve violations:d.a.039160890rd.b.039160888hd.c.039160887x e.no change in u...
Erect new awning with copy at osp. no change in use, egress or certificate of occupancy.