Search Building Permits
14,853 permits · Roofing
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KW
EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors.
Installation of solar panels, rooftop, railed,grid-tied, 12 modules, 5.22kw
Supplemental to pcis # 25014-30000-05019. Additional work in main living area. Remove and replace termite damaged sub-floor, walls. Rplace ceiling joists and roof rafters. New insulation, roofing mate...
ePlan: Commercial Expedited Review - Phase 3B New Construction of Multi Family Res with Res Units Sky Lounge Roof Lounge and Restrooms. ***Phasing - Minor phasing change from approved plans - Fitness...
Installation of sol.ar panels, rooftop, railed, grid-tied, 12 modules, 4.92kw
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will rem...
Installation of photovoltaic solar array on existing roof system as per plans
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Installation of solar panels, rooftop, railed, grid-tied, 18 modules, 7.38kw
Application of an approved coating to an existing roof.
Renovation of HVAC system on 1st, 2nd, and roof as related to office renovation in MAIN ADMINISTRATIVE BUILDING. No change in use, egress, or occupancy.
Gut renovation to apartments located on the 7th -9th floors and two levels of rooftop terraces. relocation of non-load bearing interior partitions. install new exterior lighting. refurbish pool. no ch...
Installation of solar panels, rooftop, railed, grid-tied, 6 modules, 2.58kw
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zon...
Facade and roof repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans.
Removal of playground equipment on the roof as per plans. No change to use, egress or occupancy.