Search Building Permits
45,442 permits · Other
General Construction taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of suspended scaffold for facade work or inspection.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
General Construction Louver work taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of temporary construction fence. no change in use, egress, or occupancy under this application.
Proposed 8'-0 high wood construction fence
Mechanical systems work on the 42nd marketing floor(41st construction floor) as per plans filed. no change to use, egress or occupancy.
Installation of temporary dry standpipe system during construction as per plans filed
Structural work as shown on the plans
Installation of 2 new security scanners at building lobbies. No actual construction proposed
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
General construction work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
18' total shared curb cut for lots: 25 & 23 (hse 3305 & 3307 richmond avenue)
GC work related to the installation of a concrete pad for two new Chlorine Tanks. No changes to the use, occupancy, and or egress under this application.
General construction modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Adding a lift at the exterior of the building from floor 1-3, No change in occupancy, egress or use.
OT: Construction of a New (1) Story Fieldhouse Building.
Modification the existing mechanical system as per plans. No change to use, egress or occupancy