Search Building Permits
45,163 permits · Other
File material hoist
Scaffold installation and mechanical means for plaza Demo
Installation of a temporary needle beams as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Heavy duty sidewalk shed as per hpd emergency declaration. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of industrial rope access for facade inspections.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of industrial rope access for facade inspections.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Modification of an existing sprinkler system on the first floor at apple store as per plnas submitted herewith, no change in use, egress or occupancy group.
Ira facade inspection
GC work related to the installation of a concrete pad for two new Chlorine Tanks. No changes to the use, occupancy, and or egress under this application.
Suspended Scaffold for Facade Restoration and Material Hoisting as Shown on Plans
General construction modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Installation of industrial rope access for facade inspections.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy