Search Building Permits
16,045 permits matching "roofing"
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Filing herewith application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Replacement of split hvac system on in the basement, floor 001, floor 002, floor 003, floor 004, and the roof. no change to egress, use, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this application
Ps 139q - patching of interior partitions and walls, patching at roof to support hvac equipment replacement. no change in use, egress or occupancy.
K050, installation of +/- 185 linear feet of chain link fence, 48 linear feet of the sidewalk shed, and scaffold (on the roof) in conjunction with dob # 322053558. no change in use, egress, or occupan...
K305 exterior masonry repairs, existing parapets replacement in kind & existng roof replacement in kind work. interior plaster work and repair & paintng.
K305 Remove & replace existing windows throughout school and 4 bulk head doors Replacement on the roof level, As per plans .minor patching of interior windows plaster work. Window shades and window gu...
K305 exterior masonry repairs, existing parapets replacement in kind & existng roof replacement in kind work. interior plaster work and repair & paintng.
Auditorium upgrade, auditorium roof, path of travel, and exterior masonry.
K050, installation of +/- 185 linear feet of chain link fence, 48 linear feet of the sidewalk shed, and scaffold (on the roof) in conjunction with dob # 322053558. no change in use, egress, or occupan...
Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level.
Ps-009m, installation of supported scaffold on the roof submitting on behalf of contractor in conjunction with dob # 103652370 for new chimney liner/s installation. no change in use, egress, or occupa...
Roof protection of adjacent properties in relation to nb application:#x01047507-i1
Install (2) new smoke vents in existing warehouse roof over new high pile storage (hps by others under separate permit 26016-20000-00005 & plan check no. b25vn38005).