Search Building Permits
2,860 permits · HVAC · NY
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls.repair various concrete elements of the tank rooms & boiler roo...
Replacement (1) new gas fired hot water heater with integral burner in the sub-cellar. reconnect low pressure gas line, existing storage tanks. remove (1) boiler. no change in means of egress use grou...
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
Renovation of cellar mechanical equipment room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
R034, installation of temporary echin, steam, condensate, and make-up water piping connected to temporary boiler submitting on behalf of the contractor in conjunction with dob # no change in use, egre...
Nycha lafayette houses (building #2), installation of temporary stack connected to mobile boilers and mounted on the facade in conjunction with dob # b00994757 and b01280426. no change in egress, use,...
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Provide new duct layout changes to the existing HVAC system in conjunction with Alt # M01343640 as per plans filed
Remove boiler, oil burner and fuel oil storage tanks.
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
Submit boiler work type for 7-combi. tankless unit(boiler & hw coil) in conjunction with nb application #322068187.
Installation ofthe newconcrete padsfor mech.equipment intank rooms andboilerroom.createnew opening inthe exterior masonry walls. repair various concrete elements ofthetank roomsand boiler room.
Installation of mechanical hvac system as per plan.
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Installation of new boilers
HVAC upgrade