Search Building Permits
2,840 permits · HVAC · NY
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,360 sq.ft. Lobby space. No change of use, egress, or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
mechanical filing for installation of hvac system with associated ductwork for tenant space #6 (77-39 Vleigh Place)
Sub-sequence file boiler application for plumbing job # q00863714.
Replace boiler, h.w.h.,bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Remove gas piping, boiler ( install elec hvac), hot water heater and replace waste line in cellar, remove all bakery equipmets @first floor, install new sink, elec. hot water heater. no change of use,...
Ps 886x, installation of temporary boiler breeching and stack, steam, condensate, and make-up water piping submitting on behalf of the contractor in conjunction with dob # x01130125. no change in use,...
BOILER WORK TYPE TO BE FILED IN CONJUNCTION WITH ALT2#301478719. Work to be done under ALT2#301478719.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no chan...
Interior reno:Bronx Family courtroom, dividing 2000SF room in 3 small hearing & Conf. rooms. Room at 2nd Fl-double ceiling, vinyl floor, HVAC & electrical system removal. Add new vinyl floors,ceiling,...
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DO...
Here to file boiler equipment work type to register (6) residential combi-boiler as per plan in conjunction with plumbing work #b01360076-s1. no change in use, egress or occupancy.
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DO...
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.