Search Building Permits
1,319 permits · Pool & Spa · CA
partial remodel of bathroom: replace cabinets, remove whirpool tub and replace with corian pan, relocate light, fan, switch and outlet.
interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferre...
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e)...
volunatary drainage improvement in crawl space, drain pipe and sump pump tie into (e) laundry waste.
Compacted structural backfill of existing pool and spa - remove pool shell)
New swimming pool with attached spa and baja. work per standard plan 268.
Grading excavation for pool/spa
Supplemental permit to 25047-10002-01358 to revise spa dimensions according to approved plan. no fee department error
Remodel the (e) pool to replaster, split drain and change water heater.
Remove the shell and back fill the (e) pool
***2025 Ineligible Wildfire Project*** Site gradingfor new SFD w/ basement, detached garage, temp. shoring, retainign walls and backfill (E) pool, pool shell to be removed ---3 of 5---
SUPPLEMENTAL TO: 24047-10000-00724 TO CAPTURE SPA DIMENSIONS ON PLANS AND STRUCTURE INVENTORY. SPA 7'x7', 3 FT MAX DEPTH.
New pool and spa per standard plan 268 and engineer detail
eplan: supp. to 25014-20000-05040, revise floor plan: minor changes on door, window, exiting storage space
Suppl. permit to 25047-20000-01518 to revise setbacks and details
ePlan Supplemental permit to 25047-10000-00613 to revise pool equipment location
ePlan. New Pool 20'x10' and New Spa 7'x7'.
ePlan: Supplemental to Permit 21030 - 10000 - 06891, to remove proposed pool, hardscape in side yard and north deck from grading scope of work. No change to the earthwork quantities.
Eplan: new pool per standard plan #268. and detail#630
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occ...