Search Building Permits
2,860 permits · HVAC · NY
Replace gas train and reconnect existing gas line to replacement boiler / burner .
Install 1 new boiler
Plumbing work limited to renovate existing kitchen, bathrooms, laundry., boiler room, drywell at an existing one family house, two stories and basement
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pans on the 17-18th Fl...
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
Existing heating and hot water boiler plant to be removed and replaced with new combined heating plant, all existing piping, valves, heat exchangers, tanks pumps to be removed. Al new hydronic equipme...
R009, installation of temporary chimney, steam, condensate and make-up water piping to a temporary mobile boiler trailer on behalf ofcontractor in conjunction with dob # 500875742 . no change in use,...
Due to new owner install new bathroom at 1st & 2nd floor ,relocating kitchen,change of boiler oil to gas & replace all plumbingfixture, conjunction with gc job b01327519-i1
Cap and remove existing boiler. install and replace plumbing fixtures on basement, 1st, 2nd, and attic for an existing one family house.
Install new hvac 5 tn mini split unit for a first floor commercial space and (2) hvac mini split units for exist (2) apartments at second floor.
Removal of existing high pressure steam service and installation of three (3) new boiler, burner, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
Hvac modifications associated with interior renovation of existing digital movie theatre auditorium 1 (dolby) as per plans filed herewith. no change in use, egress or occupancy.
Filing for new mechanical HVAC split units as per plan
Installation of hvac blower units on 2nd floor and hvac condensing units at rear yard with access metal ladder at rear of building
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems, including heating and cooling units, associated condensers, mechanical exhaust systems, and exhaust ductwork and as...
Q018, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 42190...
Hvac installation for an existing 2 family, 2 story and basement townhouse. no change in use, bulk, occupancy or egress.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Filing for new mechanical HVAC split units as per plan
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change of use, occupancy or egress