Search Building Permits
2,860 permits · HVAC · NY
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Filing for hvac units for commercial space fit out as per plans filed herewith in conjunction with alt2# 421945140. no change in egress, use or occupancy.
General construction for removal of existing boiler flue in courtyard, as shown on plans filed herewith. No change to use, egress, or occupancy.
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01349048 as per plans filed no change in use occupancy or egress
Modify existing curtain wall and rear exterior wall of the hotel building for new HVAC unit installation in guestrooms from 2nd to 17th floor. No change to use, occupancy, egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Replacement of one(1) existing dual-fuel boiler/burner with one(1) new dual-fuel boiler/burner, existing storage tank to remain, as per plans filed herewith. no change in use, egress or occupancy. see...
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Installation of temporary gas piping to temporary boiler as per plans filed herewith.
Install new ductwork and diffusers per new layout. install new vav box and control. connect new ductwork to existing building hvac system. install new exhaust fan and ductwork at existing tenant space...
Installation of plumbing fixtures at first and second floor-installation of (2) combi boilers and new bathroom at cellar.
Replace (1) existing 7 modules boiler with 4 new boilers in the 4fl boiler room, in conjunction with the pl work type b00923361. 1 boiler registered in the b00923358-i1, 3 boilers registered in the b0...
Installation of generator systems in conjunction with nb #x01048469-i1.
NYCHA BOILER_BLDG#11_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drain...
NYCHA BOILERS_BLDG#3_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas pipi...
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...
Filing for hvac units for commercial space fit out as per plans filed herewith in conjunction with alt2# 421945140. no change in egress, use or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Ps-284 clearview pump station reconstruction hvac work includes new hvac equipment (exhaust fans, supply fans, associated ducting, air conditioning , and unit heaters) for new above grade pump station...
HVAC system installation, Contract TI-168 to rehabilitate & upgrade the headworks of the Tallman Island WRRF. Systems comprise of heating & ventilation units, exhaust fans, hot water coils, hydronic p...