Search Building Permits
2,835 permits · HVAC · NY
add new washer, boiler and water meter in basement
Replace boiler and reinstall existing gas burner as per plans. no change in use, egress or occupancy.
File to legalize replacement of gas/oil burner on existing boiler. filing to address (4) open violations; 39088698n, 39088697l, 37032986m, 37032985k. no change in use, egress or occupancy.
Register mobile emergency heating trailer at this address. (trailer no. mht-17)
Installation of temporary chimney, 8 steam, 2.5 condensate, and 1make-up water piping to connect temporary mobile boiler trailer and existing heating plant located in the boiler room of the building....
Ps 055r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 50...
Plumbing work: gas & domestic piping associated with new dual burner boiler replacement project as per plans filed herewith. no change in use, egress or occupancy.
Plumbing work at exist. (4) apartments units on 2nd & 3rd floors; new apartment on first floor & cellar space, (5 bathrooms and 5 kitchens); boiler & meter rooms on cellar, scope of work transferred f...
Propose to install new boilers for the new building.
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
This Application in conjunction with PL Job Q00603704 to address OATH/ECB Violation 32073642H & 32073641X. Besides, this application also correct the maximum allowable working pressure in the Q0060368...
Q018, installation of temporary chimney, steam, condensate & makeup water pipings to connect temporary boiler during renovation of main building heating plant in nyc public school. no change in use, e...
Installation of temporary chimney, 8 steam, 2.5 condensate, and 1make-up water piping to connect temporary mobile boiler trailer and existing heating plant located in the boiler room of the building....
Ps 055r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 50...
Installation of new boilers. emergency shut off switches and associated ventilation. No changes to use, occupancy or egress.
Replace boiler and reinstall existing gas burner as per plans. no change in use, egress or occupancy.
Replace (1) boiler and (1) hot water heater for an existing building. no change the use, egress or occupancy.
Installation/ replacement of new pl fixtures on new roughing and replacing existing gas boiler & water heater with new in cellar.
add new washer, boiler and water meter in basement
Interior alterations to a 2 family dwelling. replace hot water heaters and boilers in cellar. replace fixtures on existing roughing in bathrooms in basement, first thru third floors. install new kitch...