Search Building Permits
2,835 permits · HVAC · NY
Interior alterations to a 2 family dwelling. replace hot water heaters and boilers in cellar. replace fixtures on existing roughing in bathrooms in basement, first thru third floors. install new kitch...
Propose to install new boilers for the new building.
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Interior renovation of existing one family house with new hvac system as per plans submitted. no change in use. egress or occupancy.
Mechanical work: steam piping & breaching associated with existing dual burner boiler replacement & new dual burner boiler addition project as per plans filed herewith. no change in use, egress or occ...
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer, boilers and hot water heaters on cellar; no change in use...
This Application in conjunction with PL Job Q00603704 to address OATH/ECB Violation 32073642H & 32073641X. Besides, this application also correct the maximum allowable working pressure in the Q0060368...
Replace boiler and reinstall existing gas burner as per plans. no change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
General Construction to Support Boiler Replacement Project
Q018, installation of temporary fence and piping support to enclose the temporary mobile trailer and support the temporary hvac piping . no change in use, egress or occupancy.
Q018, installation of temporary chimney, steam, condensate & makeup water pipings to connect temporary boiler during renovation of main building heating plant in nyc public school. no change in use, e...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change of use, occupancy or egress under this application.
Nycha boiler - existing 320 hp boilers to be removed by contractor. removebreeching, steam and condensate return piping to existing boiler, associated valves, fuel oil pipes, controls and supports.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burner. no change in means of egress use group or occupancy
Plumbing work: gas & domestic piping associated with new dual burner boiler replacement project as per plans filed herewith. no change in use, egress or occupancy.
Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change in use, egress or occupancy.
Ps 021q, installation of temporary chimney, steam, condensate & makeup water piping to connect temporary boiler on behalf of contractor in conjunction with dob # 421898717. no change in use, egress, o...