Search Building Permits
2,835 permits · HVAC · NY
Modification of HVAC duct work on 14th floor to accommodate renovations in the existing office building as per plans
125/25 install two identical gas fired condensing boilers connected to existing hot water tanks per plan
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Subsequent filing of structural work (steel dunnage for hvac) in conjunction with dob#q01226393-i1.s2 (supermarket/mechanical). work includes installation of new steel dunnage w/ concrete base at osp...
Install three split units hvac system for existing three family house, no change in use, egress, and occupancy.
Mechanical work in relation to new gut renovation/enlargement of existing single family dwelling. New VRF split system HVAC equipment proposed.
Mechanical work in conjunction w/ interior reno. Upgrade of heating system; new condensing boilers - heating hot water & domestic hot water. New radiators installed in each Apt; updated piping, equipm...
125/25 replace existing conventional hot water heater with two condensing hot water boilers. with direct vent & intake air all connected to existing hot water tanks and gas piping.
Mechanical work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install through-wall air conditioners and bathroom exhaust as per plans associated construction filing m...
Modifications to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Replacement of existing HVAC unit for first floor (Fedex Store) of premises. No change in use, egress or occupancy under this application.
Provide protection for the replacement of existing boilers and air conditioning equipment to comply with Local Law 97. Minor interior work replacing doors and relocate managers office space. No change...
H&R Block - Replacement of existing HVAC unit on the 1st floor retail space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
FOR RESIDENTIAL TENANT: INSTALL NEW COMBI-BOILER IN 2nd FLOOR APARTMENT
Modification of HVAC system. Remove existing and Install new HVAC system at Cellar, Basement , and 1st floors.
125/25 replace existing conventional hot water heater with two condensing hot water boilers. with direct vent & intake air all connected to existing hot water tanks and gas piping.
Provide protection for the replacement of existing boilers and air conditioning equipment to comply with Local Law 97. Minor interior work replacing doors and relocate managers office space. No change...
Repairs to lower carbon emissions, demolish steam boiler and associated radiators and RIP mechanical equipment, install electric heaters in lieu of steam radiators and equipment for electrical sub-met...
Mechanical work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install through-wall air conditioners and bathroom exhaust as per plans associated construction filing m...