Search Building Permits
134,933 permits
Install illuminated d/f projecting accessory sign
Erect and install illuminated wall sign to read puregym with logo. not within view of arterial highway or public park 1/2 acre or more. no change in use egress or occupancy
File suspended scaffold outrigger systems for facade restoration and inspection
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting documents
Installation of photovoltaic solar array on existing roof system as per plans.
Replace rooftop hvac condenser and install new dx coil in existing air handler on ground floor.
Installation of suspended scaffold for facade work or inspection.
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Removal of all walls, floor finishes, ceiling lighting, power, voice data, and millwork on the 24 floor office space as per plans. no change in use, occupancy, or egress
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Combination of apartments without affecting the Certificate of Occupancy as per TPPN 3/1997. Penthouse F and Penthouse G combined into one apartment PHFG. All work completed under job #110478199. No c...
Installation of temporary construction shoring for excavation as indicated on plans.there will be no change in the use, egress, or occupancy under this application.
Illuminated non-advertising accessory wall sign - in property lines - salad house. no change of use, egress or occupancy.
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.