Search Building Permits
2,835 permits · HVAC · NY
Repairs to lower carbon emissions, demolish steam boiler and associated radiators and RIP mechanical equipment, install electric heaters in lieu of steam radiators and equipment for electrical sub-met...
Mechanical work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install through-wall air conditioners and bathroom exhaust as per plans associated construction filing m...
Modification of HVAC duct work on 14th floor to accommodate renovations in the existing office building as per plans
Application filled to install HVAC system in conjunction with Job#B01085185
125/25 replace existing conventional hot water heater with two condensing hot water boilers. with direct vent & intake air all connected to existing hot water tanks and gas piping.
H&R Block - Replacement of existing HVAC unit on the 1st floor retail space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Subsequent filing of structural work (steel dunnage for hvac) in conjunction with dob#q01226393-i1.s2 (supermarket/mechanical). work includes installation of new steel dunnage w/ concrete base at osp...
installation of hvac equipment and exhaust fans
Replacement of existing HVAC unit for first floor (Fedex Store) of premises. No change in use, egress or occupancy under this application.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures on 1st and 2nd floor; new 2-pcrestroom, washer, dryer, boilers and hot water heaters in cella...
Mechanical work in conjunction w/ interior reno. Upgrade of heating system; new condensing boilers - heating hot water & domestic hot water. New radiators installed in each Apt; updated piping, equipm...
125/25 install two identical gas fired condensing boilers connected to existing hot water tanks per plan
Modifications to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical work in relation to new gut renovation/enlargement of existing single family dwelling. New VRF split system HVAC equipment proposed.
Hvac modifications for cellar of existing commercial building as per plans filed herewith. no change in use, egress or occupancy
Modifications to HVAC system in single family dwelling. New units and duct modifications.
Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail Space - Renovations.) No change to use, egress or occupancy...
FOR RESIDENTIAL TENANT: INSTALL NEW COMBI-BOILER IN 2nd FLOOR APARTMENT
Gas connection to replacement gas boilers and hot water heaters. install domestic hot water storage tanks. aka 129 north 3rd street, brooklyn
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.