Search Building Permits
2,835 permits · HVAC · NY
Installation of new HVAC for a Renovated (1) family house. No change of use, egress or occupancy under this aaplication.
Installation of hvac system as per plans attached herewith. no change in use, egress and occupancy.
Installation of a split air conditioning system for supplemental cooling for the auditorium.
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Herewith filing for new installation of hvac system.
Replace one (1) gas-fired furnace, condenser unit and evaporator coil to serve the 1st floor system as per plans. install new fire-rated sheetrock walls and doors to create new mechanical room as per...
The purpose of this filing is to provide demolition of interior non-bearing walls and to propose hvac system for existing 1 story building. this filing is in conjunction with application # b01209860-i...
Bathroom exhaust & HVAC system in conjunction with construction as per the plans filed herewith
Install replacement boiler/burner unit as per plans. filing in conjunction with x01361259-i1-la. no change to use, occupancy or egress.
Installation of HVAC mini splits per plans.
HP SP: Modifications to HVAC Equipment and ductwork to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
Provide a Maxon Valve to main Gas line and extend cold water supply to new Boilers
Hvac work at 154th pumping station. nyc dep capital project wp-269 ps-des-2.
Installation of HVAC equipment for 233rd Street Pumping Station NYC DEP Capital Project WP-269 PS-DES-2.
1.install domestic hot water heater system, domestic hot/cold system/piping, sanitary/vent piping, gas piping, and storm drainage system/piping. 2. install new ejector pumps for cellar and new elevato...
Install replacement boiler/burner unit as per plans. filing in conjunction with x01361259-i1-la. no change to use, occupancy or egress.
Installation of new HVAC for a Renovated (1) family house. No change of use, egress or occupancy under this aaplication.
Installation of a split air conditioning system for supplemental cooling for the auditorium.
The purpose of this filing is to provide demolition of interior non-bearing walls and to propose hvac system for existing 1 story building. this filing is in conjunction with application # b01209860-i...