Search Building Permits
2,835 permits · HVAC · NY
Herewith filing for new installation of hvac system.
HP SP: Modifications to HVAC Equipment and ductwork to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
Replace one (1) gas-fired furnace, condenser unit and evaporator coil to serve the 1st floor system as per plans. install new fire-rated sheetrock walls and doors to create new mechanical room as per...
Installation of HVAC mini splits per plans.
Mechanical work-type only to legalize existing hvac units.
Bathroom exhaust & HVAC system in conjunction with construction as per the plans filed herewith
1.install domestic hot water heater system, domestic hot/cold system/piping, sanitary/vent piping, gas piping, and storm drainage system/piping. 2. install new ejector pumps for cellar and new elevato...
Installation of hvac system as per plans attached herewith. no change in use, egress and occupancy.
Provide a Maxon Valve to main Gas line and extend cold water supply to new Boilers
Installation of new HVAC for a Renovated (1) family house. No change of use, egress or occupancy under this aaplication.
Connect to existing gas piping for one (1) replacement gas-fired furnace to serve the 1st floor system as per plans. no change in use, egress or occupancy.
Facade renovation modification associated with hvac scope and window replacement. no change to use, egress nor occupancy.
JOB FILED HEREWITH FOR NEW BOILER EQUIPMENT IN THE BASEMENT AS PER PLANS, INCLUDING INSTALLATION OF NEW TANKLESS COMBI HEAT/HWH BOILERs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Herewith filing mechanical for new HVAC unit and duct reconfigurations per plans. No change of use, egress, or occupancy.
Propose to install new boilers for the new building.
Relocation of hot water heaters and boiler as per plan. No change of use, egress, or occupancy. Existing Fire House EC299
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...