Search Building Permits
2,081 permits · Demolition · NY
Herewith filing demolition and renovations at existing Media and TV Studios at 1st Floor and Build-out of new computer lab as 2nd floor as per plans. No change in Use, Egress or Occupancy is proposed...
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # x01315552. no change to use, egress or occupancy under this application.
General construction to demolish a portion of the kitchen wall, relocation of kitchen cabinetry and building a kitchen island. No change in use, egress or occupancy.
Install temporary construction fence in conjunction with full demolition and new building work at 280 19 street. no change in use, egress and occupancy under this application.
Interior demolition
Interior Demolition
Sprinkler demolition on the 3rd floor, 23rd floor construction (24th floor marketing) 24th floor construction (25th floor marketing) as indicated on drawings.
Legalization for full demolition to a two story house
Interior renovation of existing apartment #2D. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith. No change in use, egress, or occupancy.
Building 7 - Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot...
General Construction for a temporary field office including partial demolition and renovation on the 2nd floor. No change in use, egress, or occupancy.
Full demolition to a five story building
Demolition of building in conjunction with adjacent buildings 2148 and 2138 Flatbush Avenue.
Construction Equipment for Full Building Demolition
Engineering Enclosure for Full Building Demolition
Construction Fence for Full Building Demolition
Alt 01 proposed extension of existing 2-story to be a four (4)-story building with (10) ten dwelling units. pursuant to qualifying residence, horizontal and vertical extention, partial demolition. obt...
Full demolition of existing 3-story temporary structure.
Installation of temporary interior scaffold system stair tower for worker access during construction operations of Alt CO filed under DOB NOW M00940950-I1 and Demolition M009564110-I1. No change in us...
Structural work: Interior clay wall to be demolished and replaced with a new CMU wall. No changes to use or egress.