NYCHA Boilers: Dyckman Building 2: Mechanical work in reference to boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman: Building 1. Civil/Site work in relation to boiler replacement as per plans filed herewith
The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disco...
Hvac modifications for 16th floor commercial space as per plans filed herewith.
Herewith filing for the installation of hvac units @ second floor apartment 2cd.
Modification of HVAC system as per plans filed herewith.
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith.
NYCHA Boilers: Dyckman Building 6: Mechanical work in association with boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. Building 1: Plumbing work in relation to boiler replacement as per plans filed herewith,.
NYCHA BOILERS Dyckman; Building 6: Site/Civil Work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. Building 1. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
Ps 128m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
NYCHA BOILERS Dyckman: Building8: Civil/Site work as per plans filed herewith. No change to use, egress or occupancy.
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or egress.
NYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
NYCHA BOILER -Dyckman. Building 8: Plumbing work in relation to boiler replacement as per plans filed herewith.
Retrofit (1) existing combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
Replace boiler and oil burner.
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...