Search Building Permits
2,850 permits · HVAC · NY
NYCHA BOILER -Dyckman. Building 3: Plumbing work in relation to boiler replacement as per plans filed herewith.
Replace boiler and gas/oil burner as per plans. no change in use, occupancy or egress.
NYCHA Boiler Dyckman: Building 8 Mechanical work in association with boiler replacement as per plans filed herewith.
NYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
To replace hvac units with mechanical work for apt# 7b& 7d as per plan filed herewith. no change of use, egress or certificate of occupancy.
NYCHA BOILERS: Dyckman: Building 4. Plumbing work in relation to boiler replacement as per plans filed herewith.
Herewith filing for the installation of hvac units @ second floor apartment 2cd.
Replace boiler and oil burner.
Modifications to HVAC to accommodate renovations to the Xray suite on partial 5th floor in the existing hospital as per plans filed herewith only.
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...
Install new HVAC system including heating and cooling for new cafe. Work also include new fresh air ventilation system
Replace boiler and gas/oil burner as per plans. no change in use, occupancy or egress.
Installation of new gas boiler in cellar apt 1E as per plans filed herewith. No change in use, egress and occupancy.
NYCHA Boilers: Dyckman Building 6: Mechanical work in association with boiler replacement as per plans filed herewith.
INSTALLATION OF 2 TEMP. BOILERS WITHIN PROPERTY FOR USE DURING NEW BOILER INSTALLATION, IN CONJUNCTION WITH LAA# B01287237-I1. BOTH BOILERS (Temp-1 #40000205559N00011, Temp-2 #40000009281N1111) WILL B...
Relocate two (2) existing 275- gallon fuel oil storage tanks. install new oil-fired hot water heater as per plans. no change in use, egress or occupancy.
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith.
NYCHA BOILER -Dyckman. Building 3: Plumbing work in relation to boiler replacement as per plans filed herewith.
The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disco...