Search Building Permits
1,985 permits · Other · CA
eplan: NEW 4-STORY DUPLEX W/ ATTACHED ADU. ATTACHED ADU PER LAMC 12.22 A.33 (c) and (e). TO BE EQUIPPED WITH NFPA 13R SPRIKLERS THROUGH OUT. NO PARKING REQUIRED PER AB 2097.
Grading for Voluntary Helical Pile installation with approved soils report to prevent further settlement of the SFD.
****2025 wildfire eo-1 eligible rebuild****remove and reccompact under the building and site grading- see comments
NEW ONE STORY DETACHED ACCESSORY DWELLING UNIT AS PER LAMC 12.22 A.33(b)(1), NFPA-13R FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING- SEE COMMENTS
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 3. State certified modular structures
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 8. State certified modular structure.
****2025 wildfire eo-1 ineligible rebuild****detached patio cover , all work per engineering
NEW DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(b)(1).
NEW 25'-11" X 38' 2-STORY ADU PER GC66323(a)(4) WITH 2-CAR GARAGE . NFPA 13D FIRE SPRINKLERS THROUGHOUT. ALL WORK PER ENGINEERING.
****2025 wildfire eo-1 eligible rebuild****remove and reccompact under the building- see comments
NEW TWO STORY SINGLE FAMILY DWELLING WITH ATTACHED GARAGE AND ATTACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (e); EQUIPPED WITH NFPA 13-D FIRE SPRINKLERS THROUGHOUT
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 11. State certified modular structure.
New 2 story sfd with attached 2 story adu and attached garage.
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 14. State certified modular structure.
(n) 2-story w/mezzanine office building at rear of lot with parking below on the 1st floor parking. fully sprinklered
ePlan:New 30' 3" x 30' two story, second story ADU per LAMC 12.22 A.33(c)* and (d)*, with attached 2 car garage on the first story. All work done per engineer
2025 wildfire rebuild, single-family dwelling, 1-story. nfpa 13d sprinklers throughout. eo8
Two retaining walls
EPLAN: Grading- excavate and backfill for retaining wall on piles