Search Building Permits
15,884 permits matching "roofing"
Ot-gc - filing herewith for the window, roof repairs/replacement and exterior masonry work there will be no change in egress, occupancy or use.
Is 281k - filing herewith the mechanical work asscoiated with the i-1 roof, windows and exterior masonry work. no change in use, egress or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladding, lintels, gravel...
These plans are filed to remove the decommisonned ductwork existing at the roof 24 w 67th street.
New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th floor Roof Terrace.
Structural work associated with the upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Filing to install outrigger and material hoist on roof for the facade work.
Roof mount solar
1400 PELHAM PARKWAY SOUTH new steel framing at south wing eighth floor for new roof over seventh floor corridor. provide new steel framing for new slab penetration at eighth floor mechanical room. Rai...
Filing herewith foundation work on the cellar and structural work on the 1st through the 3rd floor and roof. no change in use egress or occupancy. filied in conjunction with application # b00831179
Is 281k - filing herewith the mechanical work asscoiated with the i-1 roof, windows and exterior masonry work. no change in use, egress or occupancy.
Filing to install outrigger and material hoist on roof for the facade work.
Structural work associated with the upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
1400 PELHAM PARKWAY SOUTH new steel framing at south wing eighth floor for new roof over seventh floor corridor. provide new steel framing for new slab penetration at eighth floor mechanical room. Rai...
Interior remodel of kitchen and bathrooms, replace existing windows and ground floor addition in kitchen area, removal of (E) fireplace, patch roof and drywall as needed
Ot-gc - filing herewith for the window, roof repairs/replacement and exterior masonry work there will be no change in egress, occupancy or use.
Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 GPS units and 1 equipment platform with related cabinets. Related conduits through 1...
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th floor Roof Terrace.