Search Building Permits
1,985 permits · Other · CA
ePlan NEW 3-story SFD with attached ADU per LAMC 12.22A.33(c) and (e). TWO attached 2- car garages on 1st floor. To be fully sprinklered NFPA 13D.
**2025 FIRE REBUILD WILDFIRE PROJECT PER EO1** NEW DETACHED ACCESSORY DWELLING UNIT PER GCS 66323 and LAMC 12.22 A.33 and (g); EQUIPPED WITH NFPA 13-D FIRE SPRINKLERS THROUGHOUT
Site grading and backfill for single family dwelling and retaining wall
2025 wildfire rebuild, single-family dwelling factory built, 2-story. nfpa 13d sprinklers throughout. ineligible
Eplan remove and reccompact under the building
[ePlan] Site Grading for project under B24LA22695
NEW 1-STORY (43'-8" X 23'-7" IRR SHAPE) ACCESSORY DWELLING UNIT PER GC 66323(a)(2). NFPA 13D FIRE SPRINKLERS THROUGHOUT.
1 feet deep Remove & Re-compaction
New 2 story sfd with attached garage (front)1 of 2
***2025 Eligible Wildfire Project Per Executive Order No. 1***Site grading for removal and recompaction for New 1-story single family dwelling w/ attached garage. --- 2 of 2 ---
2025 wildfire rebuild, single-family dwelling, (2)-story. nfpa 13d sprinklers throughout eo8
Eplan: backfill (e) retaining wall
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout eo1
New 25'0"x16'0" open trellis[3 of 4]
***2025 Eligible Wildfire Project Per Executive Order No. 8*** new site retaining wall--- 4 of 5 ---
ePlan: New 3,241 SF 2-story Single-Family dwelling.
New 7'4"x13'4" recreation room with an attached 19'2"x13'4" trellis.[2 of 4]
2025 wildfire rebuild, single-family dwelling with an attached garage, (1)-story. nfpa 13d sprinklers throughout
ePlan NEW 3-story duplex with TWO attached 2-car garages on 1st floor. To be fully sprinklered NFPA 13D.
2025 wildfire rebuild, single-family dwelling, 2-story. nfpa 13d sprinklers throughout. eo1