Search Building Permits
16,045 permits matching "roofing"
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x20'-0' '. hip roof height to peak: 13'-0' '.
Engineered enclosure system for roof and overhead protection of adjoining equipment and spaces
Application of an approved coating to an existing roof.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
EPLAN: Interior Remodel to Ex. SFD at bathrooms, kitchen, and bedrooms. Covered Patio Addition with Roof Deck Above.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
New 23 story building with roof
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Installation of solar panels on roof. no change in use, egress, or occupancy.
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this application
Filing herewith application for installation of roof mounted solar panels. no change in use, egress or occupancy.
REMODEL OF (E) 2-STORY SFD INCLUDING NEW BEDROOM AND NEW ROOF FRAMING. NO SQFT ADDED.WORK DONE PER ENGINEER DESIGN***13D SPRINKLER REQUIRED***"COMPLY WITH DEPARTMENT ORDER effective date06/12/2024. PE...
Supplemental permit to 25014-30000-04524 to add (n) cantilevered balcony & steps, structural revisions at living room, new roof at 2nd floor hallway, repair and replace drywall.
Installation of +/-112 feet high x +/- 16 feet wide temporary supported scaffolding & stair tower, as per plans, for exterior partial roof replacemen / reapir work. no change in use, egress or occupan...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.