Search Building Permits
2,081 permits · Demolition · NY
Filing for interior demolition of non-load bearing partitions and general construction of an apartment unit. No change of use, egress or occupancy.
Demolition of structure
installation of construction fence to protect site during full demolition.
Full Demolition of existing 2 story building.
Minor interior renovation to apartment unit 1d,3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows a...
Alteration filed for two new ada compliant restrooms on 5th floor. scope of work includes minor demolition, new walls, new doors, floor and wall finishes and ceilings as per plans attached. no changes...
General construction application for Apt 7A to reconfigure the primary bedroom entrance, relocate its closet, and add a hallway linen closet. Work includes demolition and erection of nonfire-rated par...
Filing for interior demolition of non-load bearing partitions and general construction of an apartment unit. No change of use, egress or occupancy.
installation of construction fence to protect site during full demolition.
INTERIOR DEMOLITION AND ALTERATION INCLUDING NON LOAD BEARING PARTITION, FIXTURES, AND FINISHES ON THE 1-4th FLOOR. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Demolition of structure
General construction application for Apt 7A to reconfigure the primary bedroom entrance, relocate its closet, and add a hallway linen closet. Work includes demolition and erection of nonfire-rated par...
Proposed interior demolition at partial 1st floor of existing mixed use building as per plan. No change in use, egress or occupancy.
Full Demolition of existing 2 story building.
Replace Mansard Windows Within Existing Framed Openings on Partial 11th Floor, Install Exterior Metal Siding, Repair/Replace Damaged Terracotta Blocks, Interior Demolition & Finish Work & Erect Tempor...
Filing herewith interior demolition and renovation on the 20th FL. as per plans filed herewith. No change to use, egress or occupancy.
Full demolition of existing 3 story building
Interior renovation of existing single-family residence, work to include demolition and installation of new finishes, millwork, lighting, new primary bedroom partition configuration as shown on plans.
The plans enclosed depict the extent, sequence, means and methods for the proposed partial demolition of the 4 story building located at 81 beaver street, borough of brooklyn, ny 11206
Legalisation of the demolition of a frame garage damaged by a storm.