Search Building Permits
3,477 permits · Demolition
The proposed demolition is for 2 story masonry garage that is not attached to residential building.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Proposed to cut, cap and demolish sprinkler system floor by floor in conjunction with full demo job # m01232460. no change to use, egress or occupancy under this application.
Installation of temporary construction fence for the demolition of 215 byrne avenue and for the new construction of semi-detached one-family residences located at 213 & 215 byrne avenue.
ePLAN. DEMO (E) DETACHED GARAGE. HANDWRECK ONLY.
Demolish existing one family dwelling per plan.
Full Demolition of existing 3 story building
mechanical means to assist with full demolition
eplan: demolish detached garage in conjunction with construction of a new ADU under 25010-20000-05843.
This Alteration is being filed for the structural and partial demolition work in conjunction with Alt CO application #B00777324. There are no change in use, egress or occupancy under this application.
Mechanical Equipment application filed subsequent to Demolition Application; job number: M01205930-I1.
Construction Fence for Full Building Demolition
ePlan. Demolish 12'x6' double face offsite sign. Take down credit to be applied to LA Metro TCN Sign FF-1.OSSIP Case #264038 (No SPI required)original permit#1986LA53188
Filing gc for interior renovation with demolition of existing partition and construction of new partition. egress to remain the same.
EplanSign demolition with takedown credit applied to LA Metro TCN FF-2.Double face sign with 72-sf panels.OSSPIP case# 266912(E) sign per 1979LA89856
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes and Renovation of Existing Pantry on Part of the 17th Floor. No Change to Occupancy, Use or Egress...
Renovation of an existing duplex apartment on the 3rd and 4th floors. Work includes non-structural demolition, general construction and minor mechanical modification as per plans filed herewith. no ch...
Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. no change to use, egress or occupancy under this application.
ePlan: Demolition of (e) auto service canopy (2 of 2)
Eplan. Demolish 12'x6' double faced offsite sign with takedown credit applied to LA Metro TCN FF-2.OSSPIP case# 261704Double sided with 72-sf panelsoriginal permit#80LA13816.