Search Building Permits
3,477 permits · Demolition
Self-cert 2019 cbrc: interior renovations to an existing office suite 2605 as per plans. work to include interior demolition, new partitions, doors and hardware, finishes, lighting, and mep components...
Off-site pole sign demolition. Double face.Double face sign with 72-sf panels.OSSIP Case# 272881original permit#82LA52639
Demolish 2 windows and 1 door, install multi-slide door per engineers design/details.
Install temporary construction fence for nb filed under dob # x00705848 & full demolition
Demolition of detached garage. On-site and off-sit fill not to exceed 300 cubic yards.
Minor demolition and erection of interior non-load bearing parition to install washer dryer and replacement of kitchen cabinets and counter apt 3un. all as per plans and applications. no change to use...
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Demolition of (e) single family dwelling and attached garage.
Demolish existing one family dwelling per plan.
Hand demolition of exisitng garage at rear yard.
Total demo of detached garage 440 SqFt circa 1940
Existing ground floor commercial area and one family dwelling unit above. removal of non-bearing walls, stairs finishes, railings, doors, trim, kitchens and bathrooms as per plans-demolition work only...
Renovation of an existing duplex apartment on the 3rd and 4th floors. Work includes non-structural demolition, general construction and minor mechanical modification as per plans filed herewith. no ch...
Total demo SFR 1868 sq.ft. Circa 1951
Filed Herewith; 8 Foot High Plywood Construction Fence Application in conjunction with Demolition Application #B01328793-I1
Demolition of one story detached house. On-site and off-sit fill not to exceed 300 cubic yards.
Demo (e) detached garage
Proposed to cut, cap and demolish sprinkler system floor by floor in conjunction with full demo job # m01264385. no change to use, egress or occupancy under this application.
Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. no change to use, egress or occupancy under this application.
First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic.