Search Building Permits
2,079 permits · HVAC · TX
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Change of Use from bank to Retail shell space (2657 SF).
ePlan: Commercial Expedited Review - Change of Use from bank to shell space (3333 SF).
Replacement of complete existing central heat and air system with or without duct work
Interior Tenant Improvement of Existing Retail Space for Building 1
Residential Expedited Review - Interior remodel for 2-story residence w/ new kitchen updated secondary bathroom new closets raised ceilings. Replace exterior siding & replace main floor windows to mat...
Change of use from Art Gallery to Restaurant with remodel of an existing 888sf building to become a restaurant.
New Construction of a Podium Pool on Level 3
Expedited Review: New 2-Story single family residence [5bed 5.5bath] with attached Garage .
Replacement of complete existing central heat and air system with or without duct work
Interior alteration of approx. (4528 SF) of existing interior space.
Expansion of current office space; no corrections or changes to the current site plan; no additional work in warehouse - Suite 101
Relocate 900 sq. ft. 1-story 1 bedroom 1 bathroom dwelling from Uhland TX to 908 E 13th St Austin. Addition to side of structure for total of 2 bed 2 bath. Scope of work will result in a 3 unit use.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system with ductwork
1 Story Single Family House. New Septic system. No additional dwelling units. (ETJ and full purpose jurisdictions-work being done on full purpose side of lot)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 Ton Vertical Heat Pump System
New two-story SFR (4br/3ba) with attach garage and covered porch/patio *PRODUCTION BUILDER- GREEN BUILDING*
This is not for the office of complex. No unit number. Replacement of complete existing central heat and air system with or without duct work Replacing the current 4 ton indoor and outdoor HVAC system...
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 4 ton single stage Goodman system. New GLXS4 condenser and horizontal coil on R32...