Search Building Permits
2,079 permits · HVAC · TX
***Timed Virtual Inspection: 03/04/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a Duplex. New construction of a 2-Story Duplex [3bed 3bath] and Autofill Pool w/SPA. Unit A New construction of a 2-Story Duplex [1bed 2bath]...
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 3 - Phase 1 (58469 SF).
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 1 - Phase 1 (22659 SF).
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* New Construction of Garage - Phase 1 (153327 SF).
Limited interior renovation - perform interior renovations on four existing offices on floor 1 by adding 3 additional phone rooms existing building core elements and restrooms are to remain and receiv...
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 6 - Phase 2 (44018 SF).
Replacement of complete existing central heat and air system with or without duct work
*Partial Demo* Addition/interior remodel to single-story SFR
New construction of 2 story SFR 4 bed 3 bath with attached garage and front covered porch/rear covered patio
*Green Building* 1 Story SFR with 4 bedrooms and 3 bathrooms with attached garage and covered porch
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 7 - Phase 2 (44018 SF).
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 5 - Phase 2 (44018 SF).
New 1-story dwelling unit 3 bed/2.5 bath attached garage covered porch and patio
Replacement of complete existing central heat and air system with or without duct work Replace 4 ton gas system
Replacement of complete existing central heat and air system with or without duct work Hvac change out
Interior remodel to existing business office. Access control is one ciper lock only.
Addition/ remodel of existing 1 story SFR
Replacement of complete existing central heat and air system with or without duct work